Whenever it gets done.
I'm thinking wiring, water, and the removable part of the sleeper will be finished up pretty quick. I already know how those go together, so its just buying parts and assembling them. The parts aren't terribly expensive, so I'll probably order them after the 1st.
I haven't even settled on sizes for the drawers yet (height), though I think I want to go roller-bearings instead of slides so I can do custom lengths easier and much, much cheaper. The roller-bearings are $35 for 100 (enough for several drawers in both our trucks), versus $240+
per drawer for slides. I've also thought about just making them full-depth, and having partial-depth removable trays for the small stuff to ride on top. The fridge probably won't go in until March - I need to pick up another battery first, and both are pretty pricey.
Right now, I'm just happy to have my stereo back the way it should be. I'd almost forgotten what a good quality sound system sounded like...
